Hardware
UEC Develops New 8 MW Gas Turbine Engine for Data Centers
UEC is developing the 8 MW GTD-8SM gas turbine engine for data centers and industrial power needs, with the first prototype expected in 2028.
September 14, 2026, 01:09 PM·CNews.ru

UEC is developing the 8 MW GTD-8SM gas turbine engine for data centers and industrial power needs, with the first prototype expected in 2028.
