Samsung Heavy Industries and Tesser Atomics signed an agreement on November 19, 2026, to develop a nuclear-powered LNG carrier. The vessel is intended for commercial routes between the United States and Europe. Samsung will handle the ship design and construction, while Tesser Atomics will supply the nuclear power system and manage regulatory approvals.

The ship will feature the Triton reactor, a compact high-temperature system cooled by molten fluoride salt. It utilizes TRISO fuel, which consists of microscopic particles with multi-layered protective shells. This fuel design was developed with support from the US Department of Energy to withstand extreme temperatures.

A key feature of the Triton reactor is the ability to refuel without shutting down the system. This capability aims to eliminate the long dockside maintenance periods required for traditional nuclear reactors, thereby improving the operational efficiency and delivery schedules of commercial LNG transport.

The project builds on technical research from the Norwegian initiative NuProShip and the SFI SAINT consortium, which is supported by the Research Council of Norway. Tesser Atomics is a member of this consortium, which focuses on the application of various reactor types for commercial shipping.

This initiative marks the second major nuclear project for Samsung Heavy Industries in 2026. In July, the company partnered with Sargent & Lundy to design standardized floating platforms for small modular reactors, which are intended to provide power to coastal cities and remote industrial sites.