Rocket Lab has officially reached its 100th mission with the Electron rocket, marking the fastest milestone achievement for a commercially developed launch vehicle. The company currently holds a record backlog of $3.57 billion, bolstered by new contracts for eight Neutron missions signed in the third quarter.

The 100th flight, designated The Mountain God Rises, launched on Nov. 14 from Launch Complex 1 in New Zealand, delivering the YAMATSUMI-II satellite to low-Earth orbit. Electron maintains a 96% reliability rate across orbital and suborbital missions, with more than 100 additional launches already scheduled.

Development of the partially reusable Neutron rocket continues, with the second stage and thrust module now undergoing hardware testing at Launch Complex 3 in Wallops Island, Virginia. The debut flight for the vehicle is targeted for no earlier than 2027, with 16 missions already booked through the end of the decade.

The company is also expanding its in-space capabilities following the May 2026 acquisition of Motiv Space Systems. A collaborative robotic arm project with NASA is scheduled for a 2027 demonstration, while the twin Blue and Gold spacecraft are currently on track to reach Martian orbit in September 2027.